NEONNigeria — Power & Renewables

Who actually decides in Nigeria’s power sector.

Neon maps the institutions, the desks inside them, the posts at each desk, and the official route in. Every row shows its source and the date it was last checked.

Built for the person writing a market-entry study on a deadline, who needs one country answered, not a platform seat.

One link scrolls down this page. One opens your mail client. Nothing here signs you up.

One row, six fieldsStructure
Institution
Nigerian Electricity Regulatory Commission (NERC)
The body that decides.
Desk
Licensing
The function inside it that holds the decision.
Role-holder
The post that sits at that desk
Named in the pack, from a published record.
Route
Generation licence application, gate by gate
The official path to that desk.
Source
nerc.gov.ng
The page the row came from. Live in every row.
Last checked
Pending the first Sweep
ISO date of the most recent confirmation.

The shape of a Neon row, shown before there is anything to sell. Values fill in as the first pack is audited.

1,240
rows in the first pack
96
Routes, gate by gate
7
DisCos mapped
$249
one time, lifetime updates

These are the build targets for the first pack. On the day it ships, this strip carries the audited counts and the date they were checked.

01/The record is public. It is scattered.

One question, and the answer is not written down in one place.

Who is the right person at the Nigerian Electricity Regulatory Commission (NERC), at the relevant distribution company, at the Transmission Company of Nigeria (TCN), at the Rural Electrification Agency (REA) — and what is the official route to them today.

Every part of that answer has been published by someone. It has not been collected. So the job falls to an analyst with a search engine and three weeks.

01Scattered across the record

Licensee registers, procurement notices, ministry pages, company sites. Each one is public. Nobody reads all of them for one study.

02Company records, not decision routes

A general contact database knows a distribution company exists. It does not know which desk approves a grid connection, or what is filed there.

03Priced for institutions

S&P Global, Wood Mackenzie and Africa Energy sell real West Africa intelligence on enterprise subscriptions. One entry study does not need a platform seat.

Neon is the alternative to those three weeks. One country, one sector, one price.

A routing schematic: institutions and desks drawn as boxes, joined by the routes between them.

Plate — institutions, desks, and the routes between them. Neon writes each of these as a row, and each row carries its source.

02/How a row is built

Here, “verified” is worthless as a claim and decisive as a receipt.

So Neon carries the receipt. A licensee register, a procurement notice, a ministry page, a company’s own site — whatever the row came from is attached to the row, with the date it was last checked beside it.

The source column stays live for a stranger, before any payment. One click lands on the regulator’s own page, showing exactly what the row said. That click is the whole argument.

What Neon reads

Licensee registersThe regulator’s own record of who holds what licence, and for which asset.
Procurement noticesLive tenders and the desk that issued them, with the closing gate.
Ministry and agency pagesMandates, programme rules, and the official application path.
Company pagesA distribution company’s or IPP’s own statement of who handles what.
Project documentsDevelopment-finance filings that name counterparties and their desks.

A Route is an ordered set of Gates

  1. InstitutionThe body that decides
  2. DeskThe function that holds it
  3. Gate 1What is filed, and where
  4. Gate 2Who reviews it next
  5. Gate 3What closes the route

Each Gate names what is filed, where it goes, and the page that says so. Where a gate is not published, Neon marks it absent.

03/The Sweep

A static list decays. An archive of change compounds.

Once a month Neon re-checks every row against the page it came from. Rows that still hold get a new last-checked date. Rows that moved are corrected. Rows whose source has gone are marked absent, not quietly kept.

What changed is published, and buyers get it by email. Sweeps are titled by date, never by version number: Sweep YYYY-MM. A desk that moved before any directory noticed is the point of the whole exercise.

The changelog, today

The first Sweep publishes with the pack. Until then, every row shows the date it was source-checked at build.

That is the real empty state of the changelog, printed here rather than hidden. Neon does not show a Sweep it has not run.

  1. Step 1SweepRe-check each row against its own source.
  2. Step 2ChangelogPublish what changed, row by row.
  3. Step 3EmailSend it to every buyer, the same day.
Fresh

The source still says what the row says. New last-checked date.

Changed

The source moved. The row is corrected and the change is published.

Absent

The source is gone, or was never published. Recorded, not guessed.

Those three marks are the only status a row can carry, and they are never used as decoration.

04/Three rules

These rules cost us rows. We keep them anyway.

Rule 1

Nothing is asserted

Every row carries the URL it came from and the date it was last checked. If we cannot show you the source, the row does not ship.

Rule 2

Absent is a value

Where a route is not published, Neon records it as absent and looks again in the next Sweep. We do not fill a gap with a guess.

Rule 3

A wrong row is our cost

If a row is wrong, we fix it within 48 hours. Or we refund you in full within 14 days. No argument.

Two things Neon will not claim: that the first pack is complete before it has been audited, and that a public record exists where it does not.

05/The pack

Nigeria — Power & Renewables

$249one time, per buyer
  • 1,240 rows across NERC, TCN, REA, NBET, the distribution companies, IPPs and large commercial offtakers
  • 96 Routes, gate by gate, each one carrying its source
  • CSV export, yours to keep and to load into your own pipeline
  • Lifetime updates: every monthly Sweep, and the changelog that lists what moved
  • 20 Brief questions, answered only from Neon rows, with the sources attached

Where this stands

The pack is being built and audited now. It is not on sale yet. Neon will not take money for it until every row carries a source and a date.

If you are pointing a company at Nigerian power, tell us which institutions and routes you need first. That answer goes into the audit.

Email hello@neon.nanocorp.app

Opens your mail client. No form, no list, no waitlist.

After Nigeria: oil, gas and local content. Then Ghana — Energy & Mining, then francophone West Africa. Each pack sold on its own, each built the same way.